🌍Singapore • Global Projects

MARINE FIRE & SAFETY TECHNOLOGY

Integrated Fire Protection for Ships & Offshore Assets

Powered by WISERISE

Request a Proposal
WISERISE Projects & References

Selected Projects & References

Class-ready engineering, retrofits, commissioning and spares across CO₂, Water Mist, Foam, Clean Agent / Inert, Dry Chemical Powder, Fire Alarm, Medical O₂, AC–OX and Dräger BGS. Instant filters, dual views and CSV export for engineering reviews.

Multi-system · Fire & Safety · BGS · Gas Racks
Class-ready docs · ABS · LR · DNV · BV · CCS
SHA/SIN · Fast-turn spares & retrofit teams
Total Projects
Last 3 Years
Systems Covered
Class/Standards
Results: 0
YearProject / VesselSystemScopeQty / SpecCustomerClass / StandardLocationHighlights

Featured Case Studies

DNV 2.7-1 Offshore Racks — CNOOC Fleet
Delivered multiple batches of offshore cylinder racks (8/16/32-bottle sets) to support extended campaigns. Turnkey docs and fast logistics reduced downtime across workboats.
MODEC MV33 — Multi-gas Package
Supplied oxygen, acetylene and argon cylinders with integrated racks and QA documentation. Consolidated export packing and on-site support streamlined yard works.
SBM Offshore China — Almirante Tamandaré FPSO
High-purity N₂ and propane bottle packages supporting commissioning phases; documentation aligned with project safety controls and acceptance testing.

Download Reference Pack

Company overview, system list and selected references in one PDF. Download PDF
Case Show / Fire Alarm Retrofit

CHANG RONG KOU(常荣口) — TYCO T2000 Fire Alarm Upgrade

Retrofit of a legacy fire alarm system on a 2000-built PCC to meet latest IMO & class expectations. WISERISE, as an authorized TYCO aftermarket partner, deployed the T2000 panel with 800-series detectors and MCP820/830 manual call points, elevating detection reliability and response.

8 detection loops
Up to 1,000 addressable devices
SIL 2 detectors · MX protocol
Docking window protected

Project Background

Aging fire alarm equipment and evolving safety requirements prompted a full-system retrofit. The upgrade aligns with IMO guidance and class rules, improving detection accuracy, response speed and maintainability while controlling lifecycle cost.

Vessel
CHANG RONG KOU (PCC, built 2000)
Scope
Engineering · TYCO T2000 supply · Installation · Commissioning
Loops & Devices
8 loops, up to 1,000 addressable devices
Standards
IMO / SOLAS · Class approvals (project-specific)

Technical Highlights

TYCO T2000 panel — 2–8 loops, scalable architecture
800-series detectors — multi-sensor smoke/heat, SIL 2
MX loop protocol — fast and reliable communication
MCP820/830 call points — indoor/outdoor emergency activation
Backward compatibility — optimised device mapping & addressing
TYCO spares — on-hand inventory via WISERISE SHA/SIN

Outcomes

  • Full 8-loop addressing & functional tests completed in ~5 days, protecting the docking schedule.
  • Detection reliability and alarm clarity improved; maintenance cost lowered with current-generation parts.
  • System operation & maintenance training delivered; documentation package ready for class/flag checks.

Retrofit Flow

01
Survey & Assessment
Audit legacy panel, devices and cabling; confirm constraints & compliance gaps.
02
Solution Design
Loop architecture, device selection, panel siting; class alignment.
03
Spares Preparation
T2000 panel, 800-series detectors, MCP820/830, bases, modules, accessories.
04
Execution Plan
Work packs and timeline to fit yard/docking program.
05
Installation & I/O
Panel swap, loop wiring verify, I/O logic and cause–effect mapping.
06
Commissioning
Addressing, device-by-device tests, alarm routing & integration checks.
07
Training & Handover
Crew operation document set for class/flag.

Why WISERISE

  • TYCO aftermarket authorization — direct access to genuine parts & support.
  • On-hand spares in Shanghai & Singapore for schedule reliability.
  • Retrofit expertise on legacy systems with class-ready documentation.

Need a Fire Alarm Retrofit?

Audit, crossover design and commissioning for TYCO/APOLLO fleets. Email Engineering
Fast Contact
SG: +65 8833 6706
SH: +86 021 5815 2905
Store: Wellerman™
Case Show / Offshore • FSO

P378 FSO — Firefighting EPC (Five Sub-systems + N₂ Snuffing)

WISERISE won the turnkey firefighting package for the P378 FSO serving the LDV field (Block 15-1/05, Vietnam). Full system design, equipment selection, integration, commissioning and documentation were delivered in-house under international class standards.

Turnkey EPC
ABS / BV aligned
Offshore standards
WISERISE brand integration

Project Background

The P378 FSO is part of the Lac Da Vang (LDV) field development led by Murphy Cuu Long Bac Oil Co. Ltd. As the process and storage hub, the platform demands high-reliability firefighting with tight integration and rigorous documentation. WISERISE delivered a single-vendor package to simplify interfaces, shorten schedule and ensure compliance.

Location
Offshore Vietnam — LDV Field (Block 15-1/05)
Role
Prime contractor — system design, selection, 3D layout, integration & commissioning
Standards
ABS / BV workflows, offshore codes, CAP437 for helideck foam
Deliverables
Cause–effect, P&IDs, datasheets, manuals, FAT/SAT packs

Delivered Sub-systems

Fixed Fire Extinguishing
Key compartments (engine/control)
Galley Duct CO₂
High-temp/oil mist protection, auto/manual release
Deck Foam — Cargo Oil Tank
Large-area foam application with stabilized supply
Helideck Foam
CAP437-compliant spray with manual emergency control
N₂ Snuffing & Purging
Inerting for hazardous spaces with interlocks
Docs & Integration
Class-ready calculations & commissioning records

Outcomes

  • Single vendor integration reduced interface risks and communication overhead.
  • Documentation package aligned with ABS/BV expectations, streamlining approvals.
  • Ready spares & engineered kits support ongoing operations and future retrofits.

Why WISERISE

Offshore standards mastery — engineering & project management aligned with class workflows.
End-to-end capability — design, selection, 3D layout, installation guidance, commissioning.
Inventory support — SHA/SIN stocked core components for fast execution.
Proven across marine — FPSO/FSO, platforms, drillships and merchant vessels.
Brand integration — WISERISE turnkey packages with clear aftersales coverage.
Retrofit + newbuild — strong aftermarket experience plus newbuild delivery.

Execution Flow

01
Concept & HAZID
Risk mapping, protection philosophy, battery limits.
02
Design & Selection
Sizing, layout, CAP437/foam/N₂ calculations; class alignment.
03
Integration
Cause–effect, shutdowns/interlocks, package interfaces.
04
FAT / SAT
Witness tests with documentation packs.
05
Commissioning
Functional checks, flow tests, crew training.
06
O&M Support
Spares strategy and lifecycle service.

Need a Turnkey Offshore Firefighting Package?

Fixed systems, deck/helideck foam, galley CO₂ and N₂ inerting — engineered for class compliance. Email Engineering
Fast Contact
SG: +65 8833 6706
SH: +86 021 5815 2905
Store: Wellerman™
Case Show / Offshore • FPSO

MODEC MV33 FPSO — OX & AC Gas Supplying Module

In 2021, WISERISE supplied a modular oxygen–acetylene (OX–AC) racking & distribution system for the MV33 FPSO project. The design minimizes cylinder movements by keeping banks secured on the uppermost continuous deck and piping gas to multiple outlet stations where it is needed.

ISO 10855-1 / DNV 2.7-1
4×4 & 8×8 module options
Multi-outlet distribution
WISERISE owned brand

Project Background

Moving individual gas cylinders around a yard or deck is time-consuming and risky. The WISERISE modular racking system centralizes cylinders, provides continuous gas delivery and reduces lifecycle cost for offshore welding, heating and cutting.

Year
2021
Role
Supply & integration of OX/AC racking and distribution
Application
Offshore FPSO module construction & commissioning
Compliance
ISO 10855-1 / DNV 2.7-1 lifting approval; hazardous chemicals license (CN)

System Highlights

Modular racks — 4×4 (up to 16 cyl) and 8×8 (up to 64 cyl) options to scale storage capacity.
One-time charging — all cylinders manifolded to a main line for single-operation pressurization.
Multi-outlet distribution — simultaneous availability at several workstations.
Damage mitigation — cylinders & accessories protected in robust frames for offshore handling.
Steady flow & precision — continuous delivery improves parameter control and reduces gas cost.
Marine engineered — corrosion-resistant build, clear labeling and safe operation on deck.

Integrated Components

  • High-pressure manifold, isolation/stop valves, outlet stations
  • Primary regulators & pressure gauges
  • Flashback arrestors and safety accessories
  • Rigid rack structure with certified lifting points

Why WISERISE

Owned brand module — standardized package for rapid deployment.
Offshore compliance — ISO 10855-1 / DNV 2.7-1 lifting certification.
Operational efficiency — fewer cylinder moves, safer logistics.
Scalable layouts — 4×4/8×8 banks with multi-point outlets.
Spares & gases — 500+ compressed gas cylinders available.
Licensed delivery (CN) — hazardous chemicals handling license.

Outcome

  • Centralized, safe and efficient OX/AC gas supply during MV33 module works.
  • Reduced handling risks and time; improved welding quality through steady gas flow.
  • Package ready for offshore lifting and deck installation with clear operations manual.

Need Modular AC–OX Distribution for Offshore?

4×4 / 8×8 cylinder racks with manifolds, regulators and flashback arrestors — engineered for ISO 10855-1 / DNV 2.7-1. Email Engineering
Fast Contact
SG: +65 8833 6706
SH: +86 021 5815 2905
Store: Wellerman™
Case Show / Retrofit • Engine Room

CO₂ System Retrofits — Class Case (2025)

For fleets undergoing scrubber additions or machinery-space changes, the fire-protection envelope must be expanded and re-validated. WISERISE delivers class-compliant CO₂ retrofits end-to-end — survey, engineering, approval, installation guidance and commissioning — with documentation aligned to class/flag.

Turnkey Retrofit
ABS / DNV / BV aligned
Engine-room protection
Global service & spares
CO₂ cylinders bank and manifold in engine-room retrofit

Project Background

When installing scrubbers or changing machinery-space layouts, the protected volume, boundaries and shutdown philosophy must be reassessed. CO₂ is a proven choice for machinery spaces due to reliability, rapid knockdown and broad class acceptance. Typical fleet context includes MAERSK / MSC / Interasia Lines / HEA Energy vessels executed in 2025.

Scope
Engine Room (Machinery Space)
Year
2025 (fleet retrofit case)
Standards
FSS Ch.5 · IMO MSC.1/Circ.1318 · Flag/Class approvals
Deliverables
Calc & drawings, cause–effect, class submission, commissioning pack
Representative Fleet
MAERSK (Estelle – IMO 9321495, Edith – 9321548, Ebba – 9321524, Eugen – 9321550, Eleonora – 9321500, Elly – 9321536) – ABS
MSC (Guernsey – 9631876 – DNV, Tavvishi – 9533995 – BV)
INTERASIA TENACITY – IMO 1018145 – DNV
HEA Hercules – IMO 9803168 – ABS

Delivered Scope

CO₂ Storage Bank
Sizing re-calc per expanded hazard volume
Release Panel & Logic
Pre-discharge alarm, time delay, ventilation/fuel trip
Piping & Nozzles
Routing optimization, density & coverage re-validation
Selectors & Manifolds
NRV/selector integrity, hydro/pneumatic tests
Detection Integration
FDS interface (if applicable), signage & UX per code
Docs & Training
Commissioning dossier, spares list, crew aids

Outcomes

  • Restored compliance after machinery-space modifications with class/flag endorsements.
  • Verified release sequence (time delay, alarms, shutdowns) improves response quality.
  • Lifecycle readiness: spares, PM windows and crew training materials in place.

Why WISERISE

Class-ready engineering — FSS/IMO/Flag-aligned calculations, drawings & submissions.
Retrofit expertise — complex scope growth from scrubber or layout changes.
End-to-end delivery — Survey → Design → Approval → Install → Commissioning.
Inventory & logistics — Shanghai / Singapore stocks & rapid mobilization.
Fleet-scale rollout — repeatable templates, cause-effect matrices, QA packs.
Clear aftersales — global service partners & periodic inspections.

Execution Flow

01
Survey & Data
Onboard survey, boundary mapping, inventory check, volume calc.
02
Engineering
Hydraulics/nozzle density, cause–effect, drawings & documents.
03
Class Liaison
ABS/DNV/BV clarifications, variance handling, approvals tracking.
04
Procurement
Cylinders/valves/nozzles/panels; QA/QC and logistics to yard/port.
05
Installation
Hot/cold works, integrity tests, panel interlocks & I/O checks.
06
Commissioning
Functional tests, simulated release (no discharge), witness & handover.

Need a Class-Compliant CO₂ Retrofit?

Engine-room protection upgrades after scrubber or layout changes — engineered for ABS/DNV/BV and delivered end-to-end. Email Engineering
Fast Contact
SG: +65 8833 6706
SH: +86 021 5815 2905
Store: Wellerman™
Case Show / Retrofit • Engine Room

Water Mist Zonal Valve Skid Retrofit — Class Case (2025)

Many fleets use local water-mist for machinery spaces. Aging zonal valve skids often suffer from solenoid-valve leakage, compromising discharge reliability and risking class findings or detentions. WISERISE delivers class-aligned retrofits end-to-end — survey, engineering, submission, approval, delivery — including full-system health checks.

Leak-proof Retrofit
SOLAS / FSS • MSC Circulars
Engine-room Local Water-mist
OEM Spares & Kits

Project Background

On container, tanker and bulker fleets using local water-mist in Category A machinery spaces, legacy skids show leaks at solenoids/manifolds and corroded fittings. We restore hydraulic integrity, serviceability and compliance, protecting yard/port windows and eliminating recurrent findings.

Scope
Engine Room (Local Water-mist)
Year
2025 (fleet retrofit case)
Standards
FSS Ch.7 · IMO MSC.1/Circ.1165 · MSC.1/Circ.1387 · Flag/Class approvals
Deliverables
P&IDs, hydraulics, cause–effect, BOM, datasheets, class submission pack
Representative Fleet
JIN XING LING — IMO 9487093 — Bulker
LIAN SHENG HU — IMO 9344837 — LR1 Oil Tanker
LIAN YUN HU — IMO 9344813 — LR1 Oil Tanker
SHI ZI ZUO — IMO 9303704 — Crude / Product Tanker (LR1)
NIAN CHI — IMO 9342085 — Product Tanker (MR/Handy)

Delivered Scope

Zonal Skid Rebuild
New solenoid packs, selector/manifold blocks, isolation & check valves
Hydraulics & Nozzles
Re-validation of density/coverage, line sizing & losses
Controls & I/O
Panel logic, pre-alarm/time delay, ESD/FDS interfaces
Serviceability
Drain/vent & test points, labeling and access improvements
Docs for Class
P&IDs, cause–effect, BOM, datasheets, revision-tracked submission
Commissioning Aids
FAT/SAT checklists, QA packs, spares kits

Outcomes

  • Restored discharge reliability; leakage risks removed; class/PSC findings closed.
  • Approved documentation pack; installation and commissioning ready for yard/port windows.
  • Lifecycle support with OEM valves, coils, manifolds, sensors and seal kits.

Why WISERISE

Class-ready engineering — FSS/MSC circulars aligned (Ch.7 / 1165 / 1387), flag/class liaison.
Retrofit expertise — complex leakage & reliability issues addressed at source.
End-to-end delivery — Survey → Design → Approval → Delivery → Commissioning dossier.
Inventory & logistics — Shanghai / Singapore stocks, kits to yard/port on schedule.
Fleet-scale rollout — repeatable templates, cause–effect matrices, QA checklists.
Clear aftersales — periodic inspections & reminders for compliance windows.

Execution Flow

01
Survey & Diagnosis
Leak mapping, valve/NRV checks, I/O review, compliance gaps.
02
Engineering
Hydraulics & coverage, selector logic, drawings, datasheets & BOM.
03
Class Liaison
ABS/DNV/LR/CCS/BV clarifications, variance handling, approvals tracking.
04
Procurement
Valves/solenoids/manifolds/sensors; QA/QC and logistics to yard/port.
05
Installation
Hot/cold works, integrity tests, panel interlocks & I/O checks.
06
Commissioning
Functional tests, simulated release (no discharge), witness & handover.

Need a Class-Aligned Water-Mist Skid Retrofit?

Engine-room local water-mist retrofit engineered to FSS/MSC circulars and delivered end-to-end with OEM kits. Email Engineering
Fast Contact
SG: +65 8833 6706
SH: +86 021 5815 2905
Store: Wellerman™

WISERISE Marine Fire & Safety Systems

Singapore brand for marine fire protection systems and safety technologies.

Systems

  • CO₂ Fire Extinguishing
  • Dry Chemical Powder
  • Water Mist
  • Inert Gas (IG)
  • Foam Firefighting
  • Oxygen–Acetylene (AC–OX)
  • Medical Oxygen
  • Breathing Gas Supply (BGS)
  • Fire Detection & Alarm

Sectors

  • Engine Room & Machinery
  • Main Deck & Cargo
  • Galley & Ducts
  • Helideck
  • Special Compartments
  • H₂S Work Environments

Contact

WISERISE MARINE PTE LTD
Add: 1 SCOTTS ROAD, #24-10 SHAW CENTRE, SINGAPORE 228208
MOB: +65 8833 6706
WeChat/WhatsApp/Line: +65 8866 9059

Shanghai WISERISE Ship Management Co., Ltd
Add: Building 5, No.39 Luda Road, Pudong New District, Shanghai, China 201322
Tel: +86 021 5815 2905

© 2025 WISERISE Marine Fire & Safety Systems. All rights reserved. Privacy Policy